Pipe welding

CLB Soudure2

Pump box, industrial boiler works

CLS Fabrication-de-pump-box

Undercarriage; Arcelor Mital

CLB Train-de-chenille

Cyclone installation, industrial Boiler making

CLS Installation-cyclone

Installation of a thickener, Industrial boiler works

CLSMontage-et-installation-d-un-epaississeur-et-de-tours-d-eau

Mining sector

The CANMEC Group offers a comprehensive range of products and services including supply / installation / major repair of mechanical equipment in mining projects.

Skills

The CANMEC GROUP has extensive expertise in products and services in the mining and metals domain.

We depend on a team with experience in large-scale project management to manage effectively all stages of a “turnkey” project, from the design to final implementation.

Our engineering and design department use cutting-edge tools as design on 3D software, calculations, finite element analysis, document management and many more.

Our manufacturing plants are equipped to produce the equipment in an optimal result environment. We also rely on a solid structure of engineering production and continuous improvement using LEAN principles for optimal production.

Our installation and start-up teams are recognized as being the best in the industry. Whether it is for procedural equipment or handling installations, we will meet your needs.

Our quality control staff ensures that the rigorous industry standards are respected throughout all stages of project implementation. Our employees are among the highest qualified in the industry to meet every individual client need.

We are also able to complete repair jobs on existing equipment. We have already completed have several projects of this genre.

Completed projects

Below is a list of our team's completed projects over the past few years:

  • Québec lithium (2012)

    Client: Canada Lithium
    Equipment: Mechanical installation (1) Metso kiln, (1) Silo with Ore, (1) thickener, cyclones and (± 30) sodium and limestone tanks
  • Welding shop expansion (2012)

    Client: Arcelor Mital Mont-Wright
    Equipment:
    • Mechanical installation, Expansion Workshops Welding shop expansion. KLS Project
    • Steam circuit, Welding shop expansion. KLS project
  • Maintenance (2011-2013)

    Client: Arcelor Mital Mont-Wright
    Equipment: Reconditioning / modification of a variety of mining shovels parts
  • Lac Bloom (2009 - 2012)

    Client: Consolidated Thompson
    Equipment: Installation of largest AG Mill in America (38 pi OD), spirals, distributors, concentrator components and external ore conveyors

Products and services

For more information on our products and services, please consult the following section: Products and services.

Achievements

To consult the list of achievements, please visit the following section: Achievements.

Contacts

For more information, please visit the following section: Contact.